Construction phases in practice

From excavation to completion.

Pentelis 8, Saronida · Photographic record 2020–2023

55 photographs / 17 stages
Earthworks at excavation level
November 2020 · Excavation
The completed pool-facing façade
August 2023 · Completion

A journey through the actual works on site, from the first earthworks to the finished façades. Selected photographs reveal the work behind the final appearance of a building.

01

Excavation

The project begins with earthworks and excavation for the basement levels.

02

Foundations & basement

Preparation of the base, reinforcement and basement wall formwork.

03

Structural frame

Columns, beams and slabs gradually form the building.

04

Masonry

Spaces and openings take shape within the structural frame.

05

Building services

Electrical routes, plumbing connections, air ducts, and heating and cooling equipment.

06

Plastering & insulation

The envelope develops through plastering, external thermal insulation and roof waterproofing.

07

Underfloor heating

Heating circuits are documented before the subsequent floor layers cover them.

08

Finishes & outdoor spaces

Windows, suspended ceilings, exterior surfaces and the final pool works.

09

Aluminium frames

Frame installation and its final relationship with openings, shading and interior spaces.

10

Balcony railings

Glass balustrades and metalwork completing the balconies.

11

Staircases & marble cladding

Internal staircase finishes, marble treads, landings and the details of the completed space.

12

Lift

The lift landing door during installation and after the surrounding finishes are completed.

13

Bathrooms

Wall finishes, sanitaryware, vanities, shower screens and lighting in the finished bathrooms.

14

Kitchens

From cabinetry and appliance installation to the completed kitchen and dining space.

15

Wardrobes & joinery

Built-in wardrobes: interior organisation, storage and completed fronts.

16

Outdoor spaces & planting

Access routes, exterior surfaces, planted roof and landscaping around the residences and pool.

17

The completed project

From construction details to the finished residential building.

View the project presentation →

Start a project

Have a property or an idea? Let’s explore what is possible.

Share the site, your needs and objectives. We will structure the next steps with technical clarity.

Email us
Based in105-107 Vasilissis Sofias Ave., Athens