Programme by phases
Construction was organised from the structural frame through handover, with intermediate checks for each system.

Residential construction · Saronida
Pentelis 8, Saronida
The challenge
The solution
The construction photo record functions as a real project diary: it connects each decision to its corresponding phase and keeps progress, quality checks and open items visible.
Key decisions
Construction was organised from the structural frame through handover, with intermediate checks for each system.
Fan-coils, heat pumps, electrical and plumbing systems are completed before final surfaces close.
External insulation, roof waterproofing and underfloor heating are checked as one comfort and durability system.
Project path
Documentation
01
02
03
04
05
06
07Construction record
The full record includes selected photographs from the actual construction phases.