Site access
A temporary access route through a neighbouring plot, with fill and controlled plant circulation.
Vertical extension · Saronida
Dionysou 67–69, Saronida
The challenge
The solution
Delivery begins with safe plant access and slope protection. Retaining-wall positions and the construction sequence are adjusted to the site’s actual ground conditions before the main structure proceeds.
Key decisions
A temporary access route through a neighbouring plot, with fill and controlled plant circulation.
Excavation for retaining works and pool in hard rock is coordinated with protection of the downhill edge.
The downhill retaining wall comes first as a protective element, with final locations adjusted to actual ground conditions.
Project path